BlueFire halts work on Fulton plant
Category: Fuels
In Mississippi, BlueFire Renewables has halted work on their Fulton plant. Construction at the site began in 2009, and was designed to produce 19 mgy. The $300m project had made progress on permitting and site preparation. The company is currently focusing on the construction of their South Korea cellulosic sugar facility with GS Caltex.
Category: Fuels