W2 Energy’s biodiesel plant to be ready by October 1

September 23, 2013 |

In Canada, installation of W2 Energy’s waste vegetable oil-based biodiesel facility will be finished by Oct. 1. A water slurry unit has also been set up at the same location, which the company says produces CWO oil slurry product that has a 10% renewable component.

Category: Fuels

Thank you for visting the Digest.