In the Netherlands, Valmet Corp will be supplying a pre hydrolysis system to Bioprocess Pilot Facility BV’s pilot plant, led by Delft University of Technology. The system has the capacity to handle 88 pounds of straw biomass per hour, although the plant is designed to handle a variety of biomass sources. The system is scheduled to be operational by August.
Category: Fuels