ICM signs contract for California gasification demo project

March 12, 2015 |

In Kansas, ICM announced a signed contract with JUM Global, LLC, a global waste solution developer contracted with the City of San Jose, CA., for a gasification demonstration unit using ICM’s proprietary technology.

This gasification demonstration unit will be operated at the San José-Santa Clara Regional Wastewater Facility, which will process up to 10 short tons per day of urban waste biomass from the San José solid waste collection program, such as urban woody biomass, storm debris, yard waste, tree trimmings, as well as construction and demolition materials, blended with a small portion of biosolids from the wastewater facility. The gasification unit will help the region by demonstrating a process, which can be utilized in both the disposition and the application of these materials to produce a high quality syngas (i.e., producer gas), which can ultimately and efficiently be used to produce transportation fuels.

Category: Fuels

Thank you for visting the Digest.