Goes on Green to construct 51 Mgy biodiesel plant in UK
In England, Goes on Green has entered the first permitting stage for a 51 Mgy biodiesel plant in North Shields.
The $61.4 million project have an initial capacity of 8 Mgy and increase to full capacity in 36 months.
Last month, British Sugar opened the first English ethanol plant. The Wissington facility has a production capacity of 18 Mgy of ethanol made from sugar beets. The plant adjoins a sugar processing facility that will provide energy for the ethanol process.
The UK government has established a Renewable Transport Fuel Obligation (RTFO), which takes effect in April 2008. The Obligation mandates that, by 2010, five per cent of all fuel sold in the UK must be from renewable sources.
The Government recently revised its costs and carbon savings from the proposed implementation of the RTFO. The cost has risen 87% to $760 per ton of carbon emission saved based on an estimated carbon savings of 700,000-800,000 tonnes. The RTFO imposes a 2.5 percent biofuel mandate in 2008, increasing to 5 percent in 2010.
Free Subscription to the Daily Biofuels Digest e-newsletter
Subscribe FREE to the world's most-widely read biofuels daily. Enter your email in the box below,
Related Stories
Hot Topics
The Hottest 50 Companies in Bioenergy
Latest algae-to-energy news
Latest jatropha news
Latest Waste-to-energy news
Entry Information
Filed Under: International • Producer News
Post a Comment | Trackback URL
You must be logged in to post a comment.


