Converting Biomass Plant into RNG – Costs, LCA: The Digest’s 2020 Multi-Slide Guide to Low-Carbon Renewable Natural Gas from Wood Wastes – Part 2

April 15, 2020 |

Part 1 Slide Guide looked at the GTI study’s resource analysis, site layout catalysts requirements, but for today’s Part 2, we are focusing on the money and the charts. Dive into the details on project development costs and spend profile, CAPEX and OPEX, economic, operational and pricing assumptions used for the model, LCA inputs for GREET, carbon intensity, and more shared by GTI who performed a study on how an existing woody biomass power plant can be converted into a RNG facility producing about 3 billion cubic feet of RNG annually.

Prev1 of 26
Use your ← → (arrow) keys to browse

Category: 8-Slide Guide

Thank you for visting the Digest.